Chevrolet Silverado Power Step Installation Guide

TOOLS REQUIRED

  • Safety goggles
  • Measuring tape
  • Flat blade screwdriver
  • Power Drill
  • 9/32” drill bit
  • 13 mm socket
  • 10 mm socket
  • Ratchet wrench and extension
  • 13mm end wrench
  • Wire crimpers
  • Wire stripper / cutter
  • 3/16” hex key wrench (allen wrench)
  • 5mm hex key wrench (allen wrench)
  • 4mm hex key wrench ( allen wrench )
  • Electrical tape
  • Weather proof caulking (silicone sealer)
  • Silicone spray

INSTALLATION GUIDE

  1. Steps 2-3 for HD 2500 and 3500 only! For all other vehicles skip to Step 4. Short Bed: Step 2 only, Long Bed: Steps 2 and 3.
  2. Remove forward most brake cable guide and replace with new guide (6).
  3. Install plastic brake cable guide (7) in rear of middle body mount. Install new parking brake cable guide (24) in existing frame hole as shown.
  4. Install threaded clamping plate (13) on top of pinch weld and thread fastener ( 10) into clamping plate and torque to 16 ft-lbs. (22 N m). Next install fastener (12), fi nger tighten only.
  5. Install driver side rear motor linkage in fourth sheetmetal tab / hole from front (Crew Cab). Linkage will then clear parking brake cable.
  6. Slide mounting T-nut into position, aligning the end of the board with the rear edge of the back door. Mount board and tighten fasteners to 10 ft-lbs. Insure linkages are squared to body prior to torquing fasteners.

Download file here

Incoming Search Terms : instalation power step silverado

Share or Bookmark this post:
  • Print
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google Bookmarks
  • LinkedIn
  • StumbleUpon
  • Technorati
  • Twitter
  • Yahoo! Bookmarks
  • Yahoo! Buzz

Leave a Reply

Incoming Search Terms : instalation power step silverado