Snap and Grow Greenhouse Guide
Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and rinse with cold clean water. DO NOT use acetone, abrasive cleaners or other special detergents to clean the clear panels.
For replacement parts – call our service line. For additional information please visit our web site: www.palram.com
Tools & Equipment
- Tape measure
- Work gloves
- Plastic or rubber mallet
- Phillipshead screwdriver
- Step ladder
- Scissors
- Spirit level – For base alignment
- Cloth
- Sort the parts and check against the contents parts list.
- Carry out the assembly steps in the order set out in the instructions.
- The front of the greenhouse is the wall including the door, and the back is the opposite wall.
- After assembly fit the greenhouse to the base using connectors no. 35 and fit the whole unit to a leveled final position.
- You may use Silicon lubricant spray in order to help you slide the profiles on the connectors. Do not spray the Polycarbonate panels. Use the rubber malet if necessary. Avoid shaking the plastic connectors.
Notes (by step)
step 3 : Profile 821 should be placed on the left hand side to be connected to profile 822. Profile 821 is the one with the connector at the end.
step 4 :After connecting profiles 816 to each other clean the connection area using a cloth. Place the cover strip on the conection only when it is clean and dry. press the cover strip from one side of the connection to the other as mentioned in picture 4.
step 7 : Profile 800 & 801 should be aligned and connected according to the illustration on page 7 a & b. plug 23 should be inserted to each connection while the two dots on the front of the plug should be in horizontal position for easy assembly.
step 9 : Use part 95 as a template in order to measure the gap between posts 800 & 801 of the greenhouse wall and roof area.
Download file here